INDUSTRIAL

Boral Bricks, Scoresby

Client: FM Global
Value: $8m

After an extreme hailstorm in March 2010, approximately 37,000sqm of Super Six asbestos roof on the Boral Brick Factory was damaged beyond repair and required replacement.  Holes in the roof caused by the hail storm left asbestos fragments contaminating the plant and equipment, requiring careful decontamination of the entire factory in addition to the replacement of the roof.

This project required works to be carried out 7 days a week (with 2 x 12 hour shifts) in order for the plant to resume operations as quickly as possible.